View Project

D’Aqua Water – Daqqou

NovaEnergia implemented a 200 KWp solar energy system for D’Aqua Water’s manufacturing site in Daqqou, Lebanon. The solution ensures continuous, cost-effective energy for this water bottling operation, significantly reducing diesel dependence and operational costs.

D’Aqua Water – 200 KWp Solar EPC

Location: Daqqou, Lebanon
Client Sector: Industrial / Bottling & Manufacturing

D’Aqua Water is one of Lebanon’s premium bottled water producers, with a high-output production line running on continuous energy loads. NovaEnergia designed and installed a 200 KWp rooftop solar system to ensure operational energy coverage while dramatically cutting down generator use and electricity expenses.

📍 The Challenge

Water bottling operations require consistent, reliable power to maintain output quality and machinery performance. Grid outages were causing interruptions, increased maintenance costs, and over-reliance on fuel-based generators.

⚡ The Solution

NovaEnergia deployed a custom-engineered EPC system, including:

  • 200 KWp of solar panels installed across optimized roof layouts
  • Smart inverter configuration with surge-handling capacity
  • On-site technician training for long-term system monitoring and management

The solution was tailored to ensure seamless integration with the client’s production schedule and machine load profile.

🌍 The Impact

The project now delivers more than $48,000 in annual savings, with a forecasted payback period of just under 3 years.
The plant has significantly cut back its diesel consumption, reducing maintenance costs and carbon emissions by approximately 300 tons per year.

🏆 Why It Matters

The D’Aqua project demonstrates that mid-sized industrial clients can achieve full solar autonomy during production hours, unlocking predictable costs and sustainable growth.

Imapact
Clean energy for high-output water bottling facility
Location
Daqqou, Lebanon
Date
April 24, 2025
Type
Lebanon projects

Let’s Build a Sustainable Future Together