View Project

Lebanese International University- Khiara, West Bekaa

This solar installation at Lebanese International University’s Khiara campus marked a milestone in regional educational sustainability. NovaEnergia delivered a fully integrated EPC solution for a system that powers a significant portion of the campus's daytime operations.

Lebanese International University – 1 MWp Solar EPC

Location: Khiara, West Bekaa, Lebanon
Client Sector: Education / University

NovaEnergia delivered a complete EPC solution for the Lebanese International University (LIU) campus in Khiara, installing a 1 MWp solar system that powers a large share of the university’s energy needs while setting a precedent for clean energy adoption in the Bekaa region.

📍 The Challenge

LIU faced frequent grid instability and rising energy costs, especially during peak daytime academic operations. Their goal was to lower reliance on diesel generators, stabilize their energy supply, and transition into a future-proof campus infrastructure.

⚡ The Solution

NovaEnergia was responsible for the full EPC process — from tailored system design and engineering to procurement and on-site execution.

The 1 MWp system was installed across multiple building rooftops and integrated with:

  • Advanced inverter management systems
  • Backup synchronization for emergency loads
  • Real-time monitoring tools accessible by the university

🌍 The Impact

The project delivers over $160,000 in annual savings and offsets more than 800 tons of CO₂ emissions per year. It has become a reference point for solar EPC excellence in Lebanon’s educational sector.

🏆 Why It Matters

The LIU project demonstrates that academic institutions outside major cities can lead the charge in renewable energy adoption — with real, measurable results.

Imapact
First major university-scale EPC in West Bekaa
Location
Khiara, West Bekaa, Lebanon
Date
April 23, 2025
Type
Lebanon projects

Let’s Build a Sustainable Future Together